T
here’s been a lot of progress on the Tin Hat Project in the last couple of weeks. We ended our 2016 cruising season on October 9th, and starting on October 10th with the help of some friends and family, we began removing everything from the David B to prepare for the new pilothouse.
We also welcomed back employees Greg K. who worked for us on the original rebuild project 12-years ago, and Tim A. who’s worked with us off and on for ten years as both a kayak guide and a jack-of-all-trades.
One of our first big projects was to remove the mast. It took a day or so of preparation before we
took the boat to Seaview North Boatyard. The weather was perfect. We pulled into the bay where we are usually hauled out of the water, but instead of having the TraveLift pick us up, they brought out a large crane came. The crew then set up some rigging and in less than half an hour, the mas
t was lifted out of the boat and onto ground. Later we removed all the hardware and bucked up the mast. Back in 2006 when we placed on the boat we followed an ancient tradition of placing coins under a new mast. The lore is that if the boat ever goes under and the crew lost, the crew will have money to pay the ferryman to cross the River Styx. After the mast was removed, Jeffrey carefully picked up the coins and stowed them away until the new mast is installed. We’ll be sure to add a 2017 coin to commemorate the year of the new mast.
Back the boat, Greg has been making the new Grand Staircase that leads to the cabins, and Tim’s been removing structures from the boat, like th
e skylight, navigation station, and pilothouse trim. He’s also been helping Jeffrey lay the ground work for the new systems.
The new custom fridge and freezer, which Eli S. began work on in the spring, moved out of the shop and onto the boat.
While we’ve been busy on the boat and in the shop, the actual Tin Hat has been in construction. Sean and Nigel from Fluid Fabrication, in Bellingham have been working hard welding the structure.
There’s been a lot going and we’ve been thankful for all the help we’ve had so far. The first few days were filled with lots of mundane things, like carting load after load of David B stuff up the dock and into the storage locker. Thank you to Carol and Steve W., Dan K., Craig T. Jack M. and Eli S. for helping to make that workload much lighter!
-Christine
PS- Here’s a video of removing the David B’s mast:




Having an eighty-plus year-old wooden boat is a lot of work, and it is sometimes hard to decide which projects are the most important to tackle. For instance, do we re-do the pilothouse, or install a new heating system? When should we start work on the engine? Do we buy a new keel cooler or grind the valves on the engine and generator? These are all on the To-do list and not long ago, as we wrestled with these questions, Jeffrey came up with an idea for how to best organize our list and make our decisions for how to tackle our project list.