Winter Happenings on the David B – Tuning Up the Engine
Winter is always a busy time on the boat. It’s when we do maintenance, make upgrades, and take on projects. Unlike last year when we built the new pilothouse, this year is a little more mellow. Our biggest project this winter is to do an engine overhaul, which means we’re removing the heads, cylinder liners, and pistons. We’ll check the piston rings, change the gaskets, and fix a water leak in the cooling system. In addition to the big stuff, all the small parts will be cleaned and checked before we reassemble the engine, and Jeffrey will be adding new sensors, so we can monitor the engine more effectively.
We put together a quick time-lapse video showing us lifting the #3-cylinder head off the engine.
Tin Hat Update – Mast, Stairs, and Coolers
There’s been a lot of progress on the Tin Hat Project in the last couple of weeks. We ended our 2016 cruising season on October 9th, and starting on October 10th with the help of some friends and family, we began removing everything from the David B to prepare for the new pilothouse.
We also welcomed back employees Greg K. who worked for us on the original rebuild project 12-years ago, and Tim A. who’s worked with us off and on for ten years as both a kayak guide and a jack-of-all-trades.
One of our first big projects was to remove the mast. It took a day or so of preparation before we
took the boat to Seaview North Boatyard. The weather was perfect. We pulled into the bay where we are usually hauled out of the water, but instead of having the TraveLift pick us up, they brought out a large crane came. The crew then set up some rigging and in less than half an hour, the mast was lifted out of the boat and onto ground. Later we removed all the hardware and bucked up the mast. Back in 2006 when we placed on the boat we followed an ancient tradition of placing coins under a new mast. The lore is that if the boat ever goes under and the crew lost, the crew will have money to pay the ferryman to cross the River Styx. After the mast was removed, Jeffrey carefully picked up the coins and stowed them away until the new mast is installed. We’ll be sure to add a 2017 coin to commemorate the year of the new mast.
Back the boat, Greg has been making the new Grand Staircase that leads to the cabins, and Tim’s been removing structures from the boat, like the skylight, navigation station, and pilothouse trim. He’s also been helping Jeffrey lay the ground work for the new systems.
The new custom fridge and freezer, which Eli S. began work on in the spring, moved out of the shop and onto the boat.
While we’ve been busy on the boat and in the shop, the actual Tin Hat has been in construction. Sean and Nigel from Fluid Fabrication, in Bellingham have been working hard welding the structure.
There’s been a lot going and we’ve been thankful for all the help we’ve had so far. The first few days were filled with lots of mundane things, like carting load after load of David B stuff up the dock and into the storage locker. Thank you to Carol and Steve W., Dan K., Craig T. Jack M. and Eli S. for helping to make that workload much lighter!
-Christine
PS- Here’s a video of removing the David B’s mast:
Jeffrey to Give Talk on Winterizing Your Boat
7 Tips for Sanding Your Brightwork
This winter has been a busy one for me and my sanders. With two skylights, sixteen teak windows, two light boxes, the rub rail, cap rail, and trunk cabin, I’ve come up with some tips to help make the chore of sanding a little more pleasant. Click over to my blog at Yachting Magazine for the article.